Friday, November 3, 2017

Software Development Life Cycle Models



Software Development Life Cycle Models

The General Model

Software life cycle models describe phases of the software cycle and the order in which those phases are executed. There are tons of models, and many companies adopt their own, but all have very similar patterns. The general, basic model is shown below:



General Life Cycle Model

Each phase produces deliverables required by the next phase in the life cycle. Requirements are translated into design. Code is produced during implementation that is driven by the design. Testing verifies the deliverable of the implementation phase against requirements.

Requirements

Business requirements are gathered in this phase. This phase is the main focus of the project managers and stake holders. Meetings with managers, stake holders and users are held in order to determine the requirements. Who is going to use the system? How will they use the system? What data should be input into the system? What data should be output by the system? These are general questions that get answered during a requirements gathering phase. This produces a nice big list of functionality that the system should provide, which describes functions the system should perform, business logic that processes data, what data is stored and used by the system, andhow the user interface should work. The overall result is the system as a whole and how it performs, not how it is actually going to do it.

Design

The software system design is produced from the results of the requirements phase. Architects have the ball in their court during this phase and this is the phase in which their focus lies. This is where the details on how the system will work is produced. Architecture, including hardware and software, communication, software design (UML is produced here) are all part of the deliverables of a design phase.

Implementation

Code is produced from the deliverables of the design phase during implementation, and this is the longest phase of the software development life cycle. For a developer, this is the main focus of the life cycle because this is where the code is produced. Implementation my overlap with both the design and testing phases. Many tools exists (CASE tools) to actually automate the production of code using information gathered and produced during the design phase.

Testing

During testing, the implementation is tested against the requirements to make sure that the product is actually solving the needs addressed and gathered during the requirements phase. Unit tests and system/acceptance tests are done during this phase. Unit tests act on a specific component of the system, while system tests act on the system as a whole.

So in a nutshell, that is a very basic overview of the general software development life cycle model. Now lets delve into some of the traditional and widely used variations.


Waterfall Model

This is the most common and classic of life cycle models, also referred to as a linear-sequential life cycle model. Itis very simple to understand and use. In a waterfall model, each phase must be completed in its entirety before the next phase can begin. At the end of each phase, a review takes place to determine if the project is on the right path and whether or not to continue or discard the project. Unlike what I mentioned in the general model, phases do not overlap in a waterfall model.

Waterfall Life Cycle Model

Advantages
Simple and easy to use.
Easy to manage due to the rigidity of the model – each phase has specific deliverables and a review process.
Phases are processed and completed one at a time.
Works well for smaller projects where requirements are very well understood.

Disadvantages
Adjusting scope during the life cycle can kill a project
No working software is produced until late during the life cycle.
High amounts of risk and uncertainty.
Poor model for complex and object-oriented projects.
Poor model for long and ongoing projects.
Poor model where requirements are at a moderate to high risk of changing.

V-Shaped Model

Just like the waterfall model, the V-Shaped life cycle is a sequential path of execution of processes. Each phase must be completed before the next phase begins. Testing is emphasized in this model more so than the waterfall model though. The testing procedures are developed early in the life cycle before any coding is done, during each of the phases preceding implementation.

Requirements begin the life cycle model just like the waterfall model. Before development is started, a system test plan is created. The test plan focuses on meeting the functionality specified in the requirements gathering.

The high-level design phase focuses on system architecture and design. An integration test plan is created in this phase as well in order to test the pieces of the software systems ability to work together.

The low-level design phase is where the actual software components are designed, and unit tests are created in this phase as well.

The implementation phase is, again, where all coding takes place. Once coding is complete, the path of execution continues up the right side of the V where the test plans developed earlier are now put to use.


V-Shaped Life Cycle Model



Advantages
Simple and easy to use.
Each phase has specific deliverables.
Higher chance of success over the waterfall model due to the development of test plans early on during the life cycle.
Works well for small projects where requirements are easily understood.

Disadvantages
Very rigid, like the waterfall model.
Little flexibility and adjusting scope is difficult and expensive.
Software is developed during the implementation phase, so no early prototypes of the software are produced.
Model doesn’t provide a clear path for problems found during testing phases.

Incremental Model

The incremental model is an intuitive approach to the waterfall model. Multiple development cycles take place here, making the life cycle a “multi-waterfall” cycle. Cycles are divided up into smaller, more easily managed iterations. Each iteration passes through the requirements, design, implementation and testing phases.

A working version of software is produced during the first iteration, so you have working software early on during the software life cycle. Subsequent iterations build on the initial software produced during the first iteration.

Incremental Life Cycle Model



Advantages
Generates working software quickly and early during the software life cycle.
More flexible – less costly to change scope and requirements.
Easier to test and debug during a smaller iteration.
Easier to manage risk because risky pieces are identified and handled during its iteration.
Each iteration is an easily managed milestone.

Disadvantages
Each phase of an iteration is rigid and do not overlap each other.
Problems may arise pertaining to system architecture because not all requirements are gathered up front for the entire software life cycle.

















3 comments: